Mercurial > repos > IBBoard.WarFoundry.API
view api/Objects/ICostedWarFoundryObject.cs @ 212:dce340f9cedc
Re #217: Rounding problem with equipment cost calculations
* Temporary solution (which I thought I'd already committed yesterday) to make sure that rounding of amount doesn't round outside limit if limit and item rounding directions are different
Re #220: Make percentage and numeric amounts more obvious
* Deprecate some calculation and presentation methods and move them to UnitEquipmentUtils
* Add method to return the number of equipment items taken rather than the amount taken
author | IBBoard <dev@ibboard.co.uk> |
---|---|
date | Sat, 21 Nov 2009 16:40:54 +0000 |
parents | 7f13ffcb8765 |
children | 391446c9b250 |
line wrap: on
line source
// This file (ICostedNamedObject.cs) is a part of the IBBoard.WarFoundry.API project and is copyright 2009 IBBoard. // // The file and the library/program it is in are licensed and distributed, without warranty, under the GNU Affero GPL license, either version 3 of the License or (at your option) any later version. Please see COPYING for more information and the full license. using System; namespace IBBoard.WarFoundry.API.Objects { /// <summary> /// An interface for WarFoundry objects that have a points value (cost) /// </summary> public interface ICostedWarFoundryObject : IWarFoundryObject { /// <summary> /// A getter for the points value of the costed object /// </summary> double Points { get; } /// <summary> /// An event that is fired when the points value of the object changes /// </summary> event DoubleValChangedDelegate PointsValueChanged; } }