view api/Objects/ICostedWarFoundryObject.cs @ 212:dce340f9cedc

Re #217: Rounding problem with equipment cost calculations * Temporary solution (which I thought I'd already committed yesterday) to make sure that rounding of amount doesn't round outside limit if limit and item rounding directions are different Re #220: Make percentage and numeric amounts more obvious * Deprecate some calculation and presentation methods and move them to UnitEquipmentUtils * Add method to return the number of equipment items taken rather than the amount taken
author IBBoard <dev@ibboard.co.uk>
date Sat, 21 Nov 2009 16:40:54 +0000
parents 7f13ffcb8765
children 391446c9b250
line wrap: on
line source

// This file (ICostedNamedObject.cs) is a part of the IBBoard.WarFoundry.API project and is copyright 2009 IBBoard.
//
// The file and the library/program it is in are licensed and distributed, without warranty, under the GNU Affero GPL license, either version 3 of the License or (at your option) any later version. Please see COPYING for more information and the full license.

using System;

namespace IBBoard.WarFoundry.API.Objects
{
	/// <summary>
	/// An interface for WarFoundry objects that have a points value (cost)
	/// </summary>
	public interface ICostedWarFoundryObject : IWarFoundryObject
	{
		/// <summary>
		/// A getter for the points value of the costed object
		/// </summary>
		double Points { get; }
		
		/// <summary>
		/// An event that is fired when the points value of the object changes
		/// </summary>
		event DoubleValChangedDelegate PointsValueChanged;
	}
}